Archive for February 28th, 2009

Week 8 Team Update:

Posted by christian on February 28th, 2009 under Early Production / Design Phase
 •  No Comments

This week saw alot of work on getting the site from concepts to working mock-ups:
- I (Christian) connected existing copies of Aaron and Pavel’s CSS/HTML/JJ pages with PHP and MySQL
- Those two also worked on some new pages I haven’t gotten a chance to really look at yet, and these will get [...]

Brandon– Week 8 update

Posted by brandon on February 28th, 2009 under Early Production / Design Phase
 •  No Comments

For this week, I worked on posting the agreed icons onto the finalized pages. It was not much work to be honest, only 3 hours.
http://www.christianmhahn.com/derivativ/wp-content/uploads/2009/02/aaron_layout_3a.png
http://www.christianmhahn.com/derivativ/wp-content/uploads/2009/02/aaron_layout_3b.png
http://www.christianmhahn.com/derivativ/wp-content/uploads/2009/02/derivativ-layout.png
http://www.christianmhahn.com/derivativ/wp-content/uploads/2009/02/profile_1_main.png
http://www.christianmhahn.com/derivativ/wp-content/uploads/2009/02/profile_1_main_add.png
http://www.christianmhahn.com/derivativ/wp-content/uploads/2009/02/profile_2_stories.png
http://www.christianmhahn.com/derivativ/wp-content/uploads/2009/02/profile_3_contribs.png
http://www.christianmhahn.com/derivativ/wp-content/uploads/2009/02/profile_4_favorites.png
http://www.christianmhahn.com/derivativ/wp-content/uploads/2009/02/profile_5_images.png
http://www.christianmhahn.com/derivativ/wp-content/uploads/2009/02/profile_6_friendupdates.png
http://www.christianmhahn.com/derivativ/wp-content/uploads/2009/02/profile_7_addfriend.png
http://www.christianmhahn.com/derivativ/wp-content/uploads/2009/02/profile_8_sendmessage.png
In case the walkthrough does not turn up, it is set in order for the original walkthrough
However after talking to Aaron yesterday, I am beginning research on promotional campaigns [...]

pavel week 8

Posted by pavel on February 28th, 2009 under Early Production / Design Phase
 •  No Comments

This week me and Aaron had to do more html and css. Here’s my share of pages:
http://www.derivativ.net/test2/home.html
http://www.derivativ.net/test2/browse.html
http://www.derivativ.net/test2/search.html
http://www.derivativ.net/test2/story.html
Took about 9 hours.
Next week I’m really have to go into javaScript to help Aaron. I still have to add js to welcome thing on home page.
Another thing that came to my mind while I was doing html/css [...]

Francesco Week 8

Posted by Francesco on February 28th, 2009 under Early Production / Design Phase
 •  No Comments

Wow, It’s week 9 already? This week I totally revised many of the buttons to coincide with the groups wished. This called for the rounded edges of previous incantations to be squared off to match the beautifully designed layouts. Also, dome assets were stripped of their background for better readability.
http://www.jervo.com/basecamp/digitalmedia2009/sp2009/update%20assets.jpg
I also created some new [...]

leigh week 8 update

Posted by leigh on February 28th, 2009 under Early Production / Design Phase
 •  No Comments

So this week I cracked down on my Javascript. I spent 6-7 hours on Lynda.com so I could make a decent spell checker, but to be honest, I also found a bunch of great open source spell checkers that have already been made. I also found a really cool feature that involves rolling [...]

Christian Week 8:

Posted by christian on February 28th, 2009 under Early Production / Design Phase
 •  No Comments

This week, the first thing I did was make the following corrections and updates to my demo from last week:
- fixed logged-out browse profile errors
- fixed broken “home” link on click while logged out
- titled document
- denied wall posting while logged out
- implemented a log-out function
- added an ‘edit profile’ page
these pages can still be [...]

Aaron Week 8 Update

Posted by aaron on February 28th, 2009 under Early Production / Design Phase
 •  1 Comment

This week I, along with Pavel, worked on transitioning from our layout comp images to actual real-deal HTML. It’s going pretty smoothly. The HTML and CSS foundation that Pavel built up is very solid, and still growing.
I did a bit of JS work this week, with the Send Message and Add Friend pop-up boxes for [...]